Friday 21 January 2022

a full deck

The raised paved area outside the conservatory has now been finished – although there is still a brick step on each side, and a railing at the front, to install.  Also, the bed at the side of the conservatory has been backfilled.  So, the outside is nearly finished, and certainly looking a lot smarter.  Just the inside floor to tile, the electrics to do, and it’s nearly done!



No comments:

Post a Comment