Friday, 23 July 2021

floor II

The beam and block floor is finished, and the brickwork edging is done.  The facing bricks are the same as used for the main house, built 22 years ago.  We were lucky the same bricks are still being made, even if they now cost three times as much.




No comments:

Post a Comment